RACC had the privilege to be part of constructing several milestone projects in Jordan in various fields, including buildings, infrastructure and landscaping, industrial, earthworks and some other challenging fields. 

Aqaba Oil Terminal Development

The Aqaba oil terminal is one of Jordan’s national infrastructure priorities. This rehabilitation project is vital for the terminal to increase the handling capacity. The oil terminal is an important element in the country’s long-term economic growth, as it is the sole source for energy security.

The oil terminal is located on the south shore of Aqaba, next to the LPG terminal that was recently executed by our company. The main aim of the rehabilitation is to enable the oil terminal to handle approximately 14 million tons of crude oil annually

Project Details

12Cost : $11.7 Million USD
Client : Aqaba Development Corporation Employer’s
Representative : Associated Consulting Engineers (ACE)
Location : Aqaba
Status : Completed in 2018

Scope of Work


The major Engineering, procurement & construction activities include:

  • Replacement of 56 existing loading arms with new (latest model) loading arms and control systems.
  • Deluge foam-water fire fighting system for truck loading area.
  • Upgrading the existing fire fighting system.
  • Control and emergency shutdown system for oil terminal operation.
  • Navigation and sector lighting systems & berthing approach system.
  • Cathodic protection for the existing piling and piping.
  • Oil spill containment booms (offshore).
  • Full CCTV system.
  • Quick release hooks, with central control and remote monitoring.
  • Walkways between dolphins (steel structure).
  • Steel structure shed for the loading area (5000 m2).
  • Replacement of existing concrete pavement of the truck loading area (15,000 m2).
  • Fire station and administration building (1000 m2).
Aqaba New Liquefied Petroleum Gas Terminal

The project’s goal was constructing a comprehensive permanent terminal, in accordance with the modern operational aspects in the field. The terminal’s purpose is to import LPG in sufficient quantities to meet the kingdom’s needs. The terminal now has up to 25,000 tons of storage capacity, and has an unloading capacity of 300 cubic meters per hour. It is now able to receive large oil vessel.

Project Details

Value : $24.3 Million USD
Client : Aqaba Development Corporation
Location : Aqaba
Status : Completed in 2015

Scope of Work
  • Engineering, procurement & construction of the following:
  • New LPG berthing and mooring dolphins.
  • Approaching trestle with approximate length of 210m and 5m width.
  • LPG platform and loading arms.
  • 8-inch liquefied petroleum gas pipeline (LPG) & 4 inch vapor return pipeline; 680m length each.
  • Provision of safety and environment protection of the new terminal.
  • Provision for electrical power supply.