RACC affordable first-time and move-up in Jordan communities that cater to all lifestyles. We build safe and solid infrastructure for Amman bus BRT & from blueprints to reality, we make it happen. we making dreams a reality, with public works.

Construction of Facilities for AMMN (BRT) System Swayleh Terminal

This project consists of the construction of Swayleh Terminal. The terminal is a cast-in-place reinforced concrete 6 stories building with two basements (total area of 20,000 m2), with all related architectural finishes and MEP works per tender documents. Work also includes construction of a tunnel leading to the terminal and landscape work.

Project Details

53Cost : $20 Million USD
Client : Greater Amman Manicipality (GAM)
Consultant : Greater Amman Manicipality (GAM)
Location : Amman, Jordan
Status : Completed in 2020

Scope of Work
  • Design, supply, install and remove shoring system with 20m height to protect sides of excavations and adjacent
    buildings, roads, facilities, with approximate land area of 8000 m2.
  • Construction of 30,000 m3 of concrete quantity and high raised slaps using special formwork systems and tower
    cranes.
  • Supply and install MEP works including complex firefighting systems, escalators, and elevators.
  • All necessary finishing works including tiling of various types of granite and marble stone tiles, high-tech false
    ceiling, concrete finishes, metal works, internal and external cladding systems, etc.
  • Construction of all external landscaping and gardens.